08:30
|
REGISTRATION
AND REFRESHMENTS
|
09:00
|
CHAIR’S
OPENING REMARKS
|
|
PLANT
OPERATION
|
09:10
|
STEAM TURBINES AND GENERATORS:
INTERACTION WITH THE INSURANCE INDUSTRY
Steve Willis, Head
of Loss Control, Engie
|
09:30
|
REPLACEMENT OF FRF PACKAGE UNIT
Simon Carr, Turbine Engineer, EDF Heysham 2 Power Station
|
09:50
|
THE STORM IS COMING: ELECTROSTATIC
DISCHARGE IN TURBINE OIL SYSTEMS
Kal Farooq, Power Generation, Pall
Corporation
|
10:10
|
LOOKING AT HUMIDITY FOR PRESERVATION
OF APPLICATIONS AND ENERGY SAVINGS IN THE UTILITIES INDUSTRY
Glen Wilson, Field Sales Engineer and
Pete Dutton, Business Development Consultant, Business Area Air Treatment,
Munters Ltd
|
10:30
|
QUESTION
AND ANSWER SESSION
|
10:50
|
NETWORKING
REFRESHMENT BREAK
|
|
BEST
PRACTICE IN GENERATOR SERVICE
|
BEST
PRACTICE IN STEAM TURBINE SERVICE
|
11:20
|
ADVANCEMENTS IN THE INSPECTION AND
SERVICE TECHNIQUES FOR LARGE TURBINE GENERATORS
Scott Robinson, Engineering Manager,
Global Service Market,
Siemens Energy
|
ASSESSMENT OF A DEEP CRACK IN A STEAM
TURBINE CASING
Vivek Mahadevan, Senior Engineer,
Siemens Power Generation Services
|
11:40
|
OBJECTIVE ASSESSMENT OF GENERATOR
STATOR WINDING INSULATION CONDITION USING A VERY LARGE PARTIAL DISCHARGE TEST
DATABASE
Howard Sedding, Insulation
Engineer,Qualitrol Iris Power
|
INVESTIGATION AND RECTIFICATION OF LP
ROTOR BLADE CRACKING
Chris Kerr, Design and Development Engineer, EDF Turbine Support Group and Gerrit
Mulder, Engineering and Quality Manager, Stork Turbo Blading SV
|
12:00
|
INTERSPERSE STATOR WINDING TO
REDUCE VIBRATION
Hideyuki Nakamura, Chief
Specialist,Toshiba and Vincent Fernagut, Head of Technical Mission,
EDF Directorate of Nuclear
Engineering (DIN) - CNEPE
|
ON-SITE SHRINK-ON ROTOR REPAIR
SOLUTION FOR FAILURE OF A 60MW GEOTHERMAL STEAM TURBINE
Enrico Foglino, Senior Engineer,
Ansaldo Energia
|
12:20
|
ROBOTIC VERSUS ROTOR OUT INSPECTION
Mark Baumann
Inspections Integration Leader, GE
Power
|
LP ROTOR SPINDLE CRACKING ASSESSMENT
Wolfgang Hahn, Head of Engineering,
EDF Energy - Coal, Gas and Renewables and Douglas
Gass, Manager Materials Engineering, Siemens Energy Service
|
12:40
|
QUESTION
AND ANSWER SESSION
|
QUESTION
AND ANSWER SESSION
|
13:00
|
NETWORKING
LUNCH
|
|
BEST
PRACTICE IN GENERATOR SERVICE
|
BEST
PRACTICE IN STEAM TURBINE SERVICE
|
14:00
|
END WINDING DESIGN AND MATERIAL
APPROACHES TO AVOID RESONANT CONDITIONS
Russell Chetwynd, Service Manager,
National Electric Coil
|
INVESTIGATIONS AND REPAIR OF A STEAM
TURBINE AFTER A LARGE FIRE
Antoine Pfister, Rotating Equipment
and Turbomachinery Engineer and Andrés Sanchez Roa, O&M Steam Turbine
Engineer, EDF CIT– Generation – Thermal Engineering Department
|
14:20
|
WHEN DOES A GENERATOR ROTOR BECOME
UNREPAIRABLE AND ULTIMATELY SCRAP?
Wojciech Betlej, Lead Tender
Engineer, Quartzelec
|
SPIRAL WELDING – CUTTING THE COST OF
MAINTENANCE, BUT NOT THE QUALITY
Stephen Kendrick, Director Sales and
Services, Spiralweld
|
14:40
|
URGENT REPLACEMENT OF DOUBLE END
DRIVE GENERATOR Roy Beardshaw, Head
of Engineering, Brush Electrical Machines
|
TURBINE LUBRICATION CHALLENGES AND
HOW THESE CAN BE MET & OVERCOME
David McCormack, Shell
|
15:00
|
QUESTION AND ANSWER SESSION
|
QUESTION AND ANSWER SESSION
|
15:20
|
NETWORKING
REFRESHMENT BREAK
|
|
INSPECTION
AND MONITORING
|
15:50
|
ELECTROMAGNETIC INTERFERENCE
DIAGNOSTICS AS A CONDITION BASED MONITORING TECHNIQUE
Mike Hughes-Narborough, Development Engineer, Doble PowerTest
Ltd and Amitoj Singh, Electrical Engineer, SSE
|
16:10
|
TORSIONAL VIBRATION MEASUREMENT AND
MODEL BASED MONITORING
Erik Knopf, Manager Rotordynamics, GE Power
|
16:30
|
PERFORMANCE ASSESSMENT, THERMAL AUDIT
OF POWER STATIONS & IOT SOLUTIONS
Jeff Parmar, Vice President Operations, UAE, Toshiba
Corporation
|
16:50
|
QUESTION
AND ANSWER SESSION
|
17:10
|
CHAIR’S
CLOSING REMARKS
|
17:20
|
END
OF CONFERENCE
|